For all orders exceeding a value of 100USD shipping is offered for free.
Returns will be accepted for up to 10 days of Customer’s receipt or tracking number on unworn items. You, as a Customer, are obliged to inform us via email before you return the item.
Otherwise, standard shipping charges apply. Check out our delivery Terms & Conditions for more details.
【INDOOR & OUTDOOR USE】 Hammock stand with chair is made of powder-coated steel pipe, which can effectively waterproof. And the tree tent uses a thick Oxford fabric with a double-layer tarp on the top, which can waterproof, and is durable and does not fade. Therefore, it is suitable for outdoor or indoor, garden, patio, deck, poolside, bedroom, living room, leisure area, etc.
【QUICKLY & SIMPLY INSTALLATION】We will provide all the necessary accessories, according to the enclosed instructions, it can be assembled easily and quickly in about 20 minutes. In addition, tree tent can be put together directly from top to bottom without completely dismantling the entire tree tent.
【STURDY & DURABLE MATERIAL】Swing chair with stand's tree tent uses 600D high-density Oxford, which is thicker and stronger than 420D on the market, and has a longer service life. In addition, frame uses a powder-coated steel pipe with a diameter of 1 inch, which is sufficient to bear the weight of 330 LBS and meet daily use.
【X-BASE DESIGN】 Hanging tent with stand base adopts a cross design. X-shaped base (44X44inch) has a larger contact area with ground and can help disperse the gravity of the hammock. There is a triangular reinforced support between the 83.7- inch-high column and the X-shaped base, which makes the connection between the base and column more tight and firm.
【COMFORTABLE & SAFE】Indoor egg chair with stand is equipped with a 118'' (L) LED rainbow decorative light bar(not including 3 AA batteries). Inflatable cushion40'' (DIA) * 4.7'' (THK) is softer and more comfortable. We also provide inflatable cylinders so that you can quickly get a comfortable base. Tent base tube is covered with foam, which is comfortable while avoiding accidental bump. 4 foot has a steel nail holes, you can use steel stakes to reinforce stand (steel stakes are not included).